Beijing Star Sales NetworkPinay escort has been reported that the Chengde Municipal Development and Reform Commission recently issued a reply to the proposal No. 01 of the second meeting of the 15th Committee of the Chengde Municipal Committee. It is mentioned that strengthen the power-based facility guarantee. We plan ahead to plan the cleaning power supporting power network projects, focus on the construction of 500 kV transformer power projects such as Ning Chengde North and Guangyuanpai Building, and ultra-high voltage power network transmission and delivery channels, constantly perfect the regional network structure and continuously strengthen the cleaning power and power transmission capabilities. Continuously increasing the protection of natural gas source, on the basis of ensuring stable supply of international coal-to-emission pipelines in Tang Dynasty, in accordance with the principle of “first-building” Sugar daddy to ensure stable air supply in Tang Dynasty international coal-to-emission pipelines, and in accordance with the principle of “first-building first”, we will accelerate the promotion of Chengcha Zhangjiakou-Chengde-Tangshan, Gubeikou-Chengde (Pingquan), and Bao’an-Qinhuang Island. babyDenamic long-driving pipeline projectSugar daddy is built to realize the full coverage of the long-driving pipeline as soon as possible to ensure the safety of our city’s gas.
The details are as follows:
Answer to the proposal No. 01 of the Second Meeting of the 15th Committee of the Political Cooperation of Chengde City
Liu Aijing Committee:
Hello, your proposal on “Suggestions on Deeply Developing Clean and Dynamic Production and Helping High-Quality Economic Development” has been received , The answers are as follows:
The proposal, as the “No. 1 Proposal” of this year’s political alliance, fully reflects the city’s high and low attention to the development and clean dynamic industry. As the principal unit of the proposal, the Municipal Development and Reform Commission will cover the opinions and suggestions in the proposal, effectively improve its political stance, clearly understand the task, and make every effort to handle the proposal. The situation of cleaning power industry in our city and the reasonable situation of “Proposal No. 1” will be answered as follows:
1. Basic situation of cleaning power industry
In recent years, our city has continued to follow the path of “economy first and green development”. We will vigorously promote the development of cleaning power industry. As of now, the total cleaning power power installation machines in our city have reached 8.6133 million kilowatts. When the power generation volume is 1.051 billion kilowatts from January to June 2022, it will account for the city’s total power installation machines and total power generation Escort manila 82.97% and 72.36% of the volume. In terms of wind, the total online wind scale has been completed and 5.382 million kilowatts, and 30 wind projects under construction and promotion in the later stage are 4.715 million kilowatts, including: 7 wind base phase II projects with a scale of 515,000 kilowatts, and 13 guaranteed projects approved in 2021, with a scale of 2.5 million kilowatts, and the market is Sugar Baby has 9 online projects with a scale of 1.4 million kilowatts, and the first batch of major base projects in the country has a scale of 300,000 kilowatts. In addition, our city will also receive a flexible indicator of 1 million kilowatts of the whole-source online load integrated and multi-energy inter-replenishing projects in 2021. In terms of photovoltaic power generation. The online photovoltaic scale has been completed and 2.5188 million kilowatts, including 1.753 million kilowatts of centralized photovoltaic stations (including 600,000 kilowatts of fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fusi-fu href=”https://philippines-sugar.net/”>Sugar baby station has 288,600 kilowatts and 477,200 kilowatts of distributed photovoltaics. 40 projects under construction and promotion are under construction and promotion, with a total scale of 6.88 million kilowatts, including: 1 average photovoltaic project with a scale of 80,000 kilowatts, 24 guaranteed projects approved in 2021, with a scale of 3.3 million kilowatts, 14 market-oriented projects with a scale of 2.8 million kilowatts, and the first batch of national bases to target photovoltaic departments with a scale of 700,000 kilowatts. Today, the project is Sugar Baby has completed all the preparations and started construction of 11. In addition, our city will also receive a flexible indicator of 2.44 million kilowatts of whole-source network integrated and multi-energy inter-compensated photovoltaic projects in 2021. In terms of hydroelectricity. 31 conventional hydroelectric stations have been built in the city with a scale of 49,500 kilowatts. After construction and promotion, it has been completed. In the period and the newly planned pumped storage power station project has a total scale of 26.78 million kilowatts. Among them, one project under construction is the world’s largest and 3.6 million kilowatts of Fengning pumped storage power station project. It has implemented two machine units (600,000 kilowatts) and launched power online at the end of 2021. It plans to 6Sugar babyOn the 12th of the Taiwan Machinery Group, the full capacity of the Taiwan Machinery Group was launched; it launched 3 later projects with 4 million kilowatts of installed machines. Among them, the 1.2 million kilowatts of pumped storage project in Fengping is underway to carry out feasibility research and the forward-preliminary operation of the Sugar baby; 2.8 million kilowatts of pumped storage in Longhua 1 and 2The project is underway for feasibility study, with 3 teachers from Ye. Visual Sugar baby strives to complete the approval before the end of this year. The new plan has listed 14 national medium- and long-term planning projects with a total scale of 19.18 million kilowatts. Today, the Provincial Power Bureau has submitted a competition to list the national pumped storage medium- and long-term planning. In terms of humidity. The “Chengde City Hydrogen Energy Industry Development Plan” has been implemented in the printing and development. The Hebei Construction Investment Group’s 100,000 kilowatts of wind power supply 2000Nm3/h mould manufacturing project and the 90,000 kilowatts of wind power supply 1000Nm3/h mould manufacturing project in the second phase of the Hexi Province Hongning Hexi is underway to implement the construction. The 30-ton/day liquid sanitary factory demonstration project of Hebei Construction Investment Group and the centralized sanitary control project of aerospace investment are actively promoting the later tasks. Biometric aspects. The city has built 3 biometric electric power generation projects with a scale of 63,000 kilowatts. The completion standard is being introduced into a later project, which is the China Bonus Nengpingquan Biometric Electric Power Generation Project with a 30,000 kilowatts of machine. In terms of ground heat. 16 hot wells have been developed in the city, and are mainly distributed in the Maoling Ruins-Qijia, Tang Sankai Xili, Fengshan Bayzi, Yudaokou, Hongtang Temple in Ning, Chengde County, Tangjiawan, and Xinglong Lijiawan. They are mostly used for bathing, raising and drinking water processing. Natural atmosphere. The entire line of coal-to-natural gas pipeline is connected, and the annual natural gas consumption in the city exceeds 100 million cubic meters. To ensure safety of the source of energy, our city is promoting the implementation of multiple long-term pipeline projects. Among them, the Zhangjiakou-Chengde-Tangshan long-term pipeline project has obtained provincial approval and is currently working on the work; Gubei does not look like a wandering cat. “The Sugar baby pipeline project is promoting later tasks. Pingquan City’s 5000 Water Cube LNG emergency gas project has been put into operation. In terms of installation manufacturing. There are four important cleaning and dynamic equipment manufacturers in the city. Among them, Longhua County Jinjian Electric Control Equipment has an annual production MW-level engine and wheel capacity of 1,200 units (sets) and Fengning Far Vision Power Equipment has an annual production MW-level engine and 500 units (sets) capacity, and Sugar daddyHigh-tech Zone Special Electric Power Technology has an annual production capacity of 500 MW photovoltaic inverters and 500 MW photovoltaic ineffective replenishment machines. The dual-reastic zone Xinxin Hydraulic Flow Energy Company has an annual production capacity of 20 MW electric reactors, 30,000 square meters of slab battery sub-film, and 3,000 cubic meters of slab batteryThe production capac TC: